Which is the best way to draw and tag an entrance which is not in the building wall but about 20 m away from the building leading underground to the basement floors. The way from the entrance to the building is a tunnel covered by earth and grass (not a grass covered roof) so it cannot be seen from above. I can imagine that my question is not unique but can appear where buildings are built on slopes. asked 10 Jun '19, 17:28 Archiver |
You can map the way in the tunnel: And then connect the tunnel to the overground road network and put an entrance=main or =yes on the end point of the tunnel. answered 10 Jun '19, 20:25 TZorn |